| TURBINE CYLINDER CLOSURE SYSTEM - OVERVIEW |
In the power generation industry, time IS money. At INTEGRA, we've developed a complete hydraulic multi-stud tensioning system that saves money by slashing the time it takes to complete a project.
By applying precise hydraulic clamping pressure, equally and simultaneously, we're able to bring both halves of the turbine casing housing together, eliminating the distortion that can occur with other approaches.
Applications such as Tops-On, Tops-Off Alignment, Blue Checks and Gasket Crushing are ideal for this approach. On critical path operations, the savings can be huge, something our many clients have discovered - bringing them back to INTEGRA for additional service.
|
| BENEFITS |
- Huge time savings
- Eliminates need for dangerous bolt heating
- Eliminates need for dangerous hammer wrenches
- Reduced man hours
- Improved worker safety
- Shortens critical path schedule
- Prevents casing leakage
- Extended bolt life
- Portable, safe and easy to use
INTEGRA is ready to put our Turbine Cylinder Closure System to work for you. Give us a call at 1-800-779-2658 or click here to reach us online for help with your next project.
|
|