TURBINE CASING

Click on these services to find out how INTEGRA provides faster, better, safer ways for turbine casing.

BlackHawk™ High performance Hydraulic Nuts use breakthrough technology to drastically speed up turnaround maintenance on turbine casings.

There are three components to FasTrakTM - High Frequency Induction Bolt Heating, Hydraulic Turbine Cylinder Closure, and ECHO Precision Bolt Load MonitorTM. The three FasTrak components make up an unbeatable system for turbine casing problems, making INTEGRA a leader in services the power generation needs to be competitive.

Call us today at 1-800-779-2658 or click here to reach us online.